Regina Laska
Read the full story of how to make a full-scaled boatrefit of the HR 46 Regina Laska. From how she was found in Italy, transported to Ellös in Orust, all the discussions how to do, to the full refit of the boat. Read the complete story and follow the refit work step by step by clicking the link below to the Regina Laska’s web site:
http://reginasailing.com/regina-laska-hr46-full-project/
You can also read about the project in the two articles in Yachting World:
Below you can follow the refitting progress from the beginning to a beautiful bird Phoenix - Regina Laska, or follow the reginasailing link above for even more details. Click images to enlarge.

Found in Italy

Rusty water is sippering between the keel and the hull

The teak deck has to be relaid

The hard top ceiling has to be changed

The companionway was leaking

The hatches are being replaced

All through-hulls have to be changed

Just arrived in Ellös, Orust

With the right tools and experience, even the hardest glue has to give in

The old teak deck is now completely stripped off

The galley is waiting for a new stove, a new sink, new water taps and a new worktop, etc.

The pieces around the stansions have been cut out by hand

The screws between the ribbons are removed later and do not destroy the teak

Carl checking the vacuum to the new vacuum-glued teak deck

Continous vacuum is crucial

The entire deck is almost ready

The engine is lifted out. It was very well maintained and needed just a service.

The engine room almost ready. A generator, red, is installed as well as a sauna unit, white.

The reconditioned ceiling. It is incredible what can be done when professionally refurbishing a boat.

Time for sanding. Not the most comfortable mode of operation



The refurbished Regina Laska under full sails in her right element